Welcome to LiftPlan Pro.

2
00:00:01,552 --> 00:00:08,277
This tutorial walks you through every lift planner and lifting calculator on the platform, step by step.

3
00:00:08,977 --> 00:00:15,585
LiftPlan Pro brings together lift planning, rigging calculations, ground bearing checks, load securing

4
00:00:15,585 --> 00:00:17,788
and lifting training in one place.

5
00:00:18,488 --> 00:00:23,721
Every tool follows the same method as its original engineering workbook, cell for cell,

6
00:00:23,721 --> 00:00:27,811
and its results were checked against those workbooks before release.

7
00:00:28,511 --> 00:00:34,889
We will start with a short tour of the website, then create an account, and then go through each tool in turn.

8
00:00:35,589 --> 00:00:41,161
The tools covered are the sling tension calculator, the side boom pipelayer lift planner,

9
00:00:41,161 --> 00:00:48,048
the forklift truck lift planner, the wooden crane mat calculator and the lashing and load securing calculator.

10
00:00:48,748 --> 00:00:54,276
After that we look at saving your work, printing A4 reports, sending a plan for approval,

11
00:00:54,276 --> 00:00:58,561
booking a lifting training course, and using the platform on a phone.

12
00:00:59,261 --> 00:01:01,734
One important point before we begin.

13
00:01:01,734 --> 00:01:04,893
These tools are planning and calculation aids.

14
00:01:04,893 --> 00:01:12,448
A competent person must always check a lift plan against the actual equipment, certificates, manufacturer data

15
00:01:12,448 --> 00:01:14,920
and site conditions before any lift.

16
00:01:15,620 --> 00:01:23,129
You can pause this video at any time and follow along on your own computer or phone at liftplanproapp.com.

17
00:01:23,829 --> 00:01:24,585
Chapter one.

18
00:01:24,585 --> 00:01:26,347
A quick tour of the website.

19
00:01:27,047 --> 00:01:30,191
This is the home page at liftplanproapp.com.

20
00:01:30,191 --> 00:01:38,053
The menu at the top leads to lift planning, calculators, training, pricing, resources, this how it works page,

21
00:01:38,053 --> 00:01:41,127
the frequently asked questions and contact.

22
00:01:41,827 --> 00:01:43,799
Even the home page calculates.

23
00:01:43,799 --> 00:01:47,085
Move the sling angle slider on this two-leg sling,

24
00:01:47,085 --> 00:01:51,555
and you can see the load in each leg rise as the sling gets flatter.

25
00:01:52,255 --> 00:01:59,242
Change the load and the angle factor stays the same, but the tension in each leg goes up in proportion.

26
00:01:59,242 --> 00:02:03,177
This is the same principle the full sling calculator uses.

27
00:02:03,877 --> 00:02:09,142
Further down, the page shows who the platform is for: the people who plan and check lifts,

28
00:02:09,142 --> 00:02:11,131
and the people who carry them out.

29
00:02:11,831 --> 00:02:15,820
Each tool has a short summary, with a link straight into the calculator.

30
00:02:16,520 --> 00:02:23,421
The lift planning page describes the side boom and forklift planners, what each plan records, the plan library

31
00:02:23,421 --> 00:02:24,989
and the report generator.

32
00:02:25,689 --> 00:02:31,663
The calculators page covers the sling tension, wooden mat and load securing calculators.

33
00:02:32,363 --> 00:02:39,334
The training academy lists lifting courses for riggers, signallers, supervisors, planners and inspectors,

34
00:02:39,334 --> 00:02:44,779
with the fee, duration, group size and certificate validity shown on every course.

35
00:02:45,479 --> 00:02:46,884
Pricing is simple.

36
00:02:46,884 --> 00:02:53,131
One subscription of 24.99 US dollars a year covers every planner and calculator.

37
00:02:53,131 --> 00:02:57,895
Two sling calculators are free to use without a subscription.

38
00:02:58,595 --> 00:03:05,485
Resources has short guides on the engineering behind the tools: sling angles, ground bearing pressure,

39
00:03:05,485 --> 00:03:08,323
forklift capacity, load securing and more.

40
00:03:09,023 --> 00:03:15,653
The frequently asked questions page answers common questions about payments, training, reports and data,

41
00:03:15,653 --> 00:03:20,052
and the contact page lets you send a message or reach us on WhatsApp.

42
00:03:20,752 --> 00:03:21,447
Chapter two.

43
00:03:21,447 --> 00:03:25,211
Creating your account, and finding your way around the dashboard.

44
00:03:25,911 --> 00:03:28,447
Click Get started at the top of any page.

45
00:03:28,447 --> 00:03:34,572
Enter your name, an optional company, your email address and a password of at least ten characters.

46
00:03:35,272 --> 00:03:41,520
Type the password a second time in the repeat password box, so a typing mistake cannot lock you out.

47
00:03:41,520 --> 00:03:43,144
Then click Create account.

48
00:03:44,715 --> 00:03:46,464
You arrive at the dashboard.

49
00:03:46,464 --> 00:03:51,646
The four tiles at the top count your lift plans, saved calculations, approved plans

50
00:03:51,646 --> 00:03:54,081
and anything waiting for your approval.

51
00:03:54,781 --> 00:04:01,192
Below them you see your recent projects, any approvals, your subscription status, your course bookings,

52
00:04:01,192 --> 00:04:03,869
and a card for each planner and calculator.

53
00:04:04,569 --> 00:04:07,369
The menu on the left is always available.

54
00:04:07,369 --> 00:04:13,380
Lift planning holds the side boom and forklift planners, the plan library and approvals.

55
00:04:13,380 --> 00:04:19,459
Lifting calculators holds sling tension, wooden mat, lashing and the calculation history.

56
00:04:20,159 --> 00:04:26,952
Under Account and subscription you can change your name, company and password, and see your subscription.

57
00:04:26,952 --> 00:04:34,197
To subscribe, click Subscribe and pay on our secure checkout page, using the same email address as your account.

58
00:04:34,897 --> 00:04:39,871
Your subscription is activated on your account automatically after payment.

59
00:04:39,871 --> 00:04:42,457
It renews once a year until you cancel.

60
00:04:42,457 --> 00:04:50,150
If you use the offline Android app, your app licence key also appears on this page once your subscription is active.

61
00:04:50,850 --> 00:04:56,683
If you ever forget your password, click Forgot your password on the sign in page, enter your email,

62
00:04:56,683 --> 00:04:59,334
and we will send you a link to set a new one.

63
00:04:59,334 --> 00:05:00,983
The link works for one hour.

64
00:05:01,683 --> 00:05:06,974
Now let us look at the tools, starting with the most used one, the sling tension calculator.

65
00:05:07,674 --> 00:05:08,577
Chapter three.

66
00:05:08,577 --> 00:05:10,447
The sling tension calculator.

67
00:05:11,147 --> 00:05:13,386
Open Sling tension from the menu.

68
00:05:13,386 --> 00:05:20,917
The calculator covers seventeen rigging arrangements, grouped by type: single-leg, two-leg, four-leg, multi-leg

69
00:05:20,917 --> 00:05:23,563
with spreader beams, and tailing lifts.

70
00:05:24,263 --> 00:05:31,117
Single-leg arrangements include the vertical hitch, the choker hitch for pipes and bundles, and basket hitches.

71
00:05:31,117 --> 00:05:34,759
Each card shows the arrangement sketch and its mode factor.

72
00:05:35,459 --> 00:05:43,062
Two-leg arrangements include the bridle hitch for loads with lugs or padeyes, choker and basket hitches for round

73
00:05:43,062 --> 00:05:47,705
or box-shaped loads, and basket hitches held apart by spreader beams.

74
00:05:48,405 --> 00:05:54,732
There are also four-leg bridles, multi-leg spreader arrangements including two-crane tandem lifts,

75
00:05:54,732 --> 00:05:58,154
and the tailing lift for upending a vessel or column.

76
00:05:58,854 --> 00:06:05,760
At the bottom, the limits of use explain what the calculator does not check, such as lifting lug strength,

77
00:06:05,760 --> 00:06:07,975
crane capacity and ground bearing.

78
00:06:07,975 --> 00:06:10,907
Always read these before relying on a result.

79
00:06:11,607 --> 00:06:15,602
Let us work through the most common one, the two-leg bridle hitch.

80
00:06:15,602 --> 00:06:17,175
Click its card to open it.

81
00:06:17,875 --> 00:06:19,992
At the top you choose the units.

82
00:06:19,992 --> 00:06:24,953
Lengths can be in metres or feet, and loads in tonnes, kilograms or pounds.

83
00:06:24,953 --> 00:06:27,731
Every input and result switches with them.

84
00:06:28,431 --> 00:06:36,416
Next to the units, choose the sling type: wire rope, chain grade 80 or 100, or polyester web or round slings.

85
00:06:36,416 --> 00:06:40,079
The gear is selected from the matching data table.

86
00:06:40,779 --> 00:06:44,372
The bar across the top always shows the overall result.

87
00:06:44,372 --> 00:06:47,443
Green PASS means all calculator checks are met.

88
00:06:47,443 --> 00:06:53,584
Next to it you see the design load, the tension in each sling, the required working load limit

89
00:06:53,584 --> 00:06:55,478
and the sling length per leg.

90
00:06:56,178 --> 00:06:57,866
Below is the input data.

91
00:06:57,866 --> 00:07:00,960
Yellow boxes are the inputs you can type in.

92
00:07:00,960 --> 00:07:05,671
Here we have a load ten feet long, two feet wide and ten feet high.

93
00:07:06,371 --> 00:07:09,519
Let us change the load weight to twelve tonnes.

94
00:07:09,519 --> 00:07:17,422
Watch the results bar: the design load, sling tensions and required working load limit all update as soon as you type.

95
00:07:18,122 --> 00:07:21,185
The next two inputs place the centre of gravity.

96
00:07:21,185 --> 00:07:25,461
X is the distance from the left lifting point and Y from the right.

97
00:07:25,461 --> 00:07:28,843
When the load is centred, both legs share it equally.

98
00:07:28,843 --> 00:07:33,055
Move the centre of gravity, and the leg nearer to it carries more.

99
00:07:33,755 --> 00:07:39,324
Here the centre of gravity is four feet from the left point and six from the right,

100
00:07:39,324 --> 00:07:42,679
so the left sling now carries more than the right.

101
00:07:42,679 --> 00:07:46,705
The COG check confirms that X plus Y equals the load length.

102
00:07:47,405 --> 00:07:50,758
Now the sling angle, measured from the horizontal.

103
00:07:50,758 --> 00:07:56,123
At sixty degrees each leg carries about fifteen percent more than half the load.

104
00:07:56,123 --> 00:07:59,945
Reduce it to fifty degrees and the tension rises further.

105
00:07:59,945 --> 00:08:02,359
A flatter sling always carries more.

106
00:08:03,059 --> 00:08:06,612
Below forty-five degrees the calculator flags a check,

107
00:08:06,612 --> 00:08:11,677
because the method used here has a minimum sling angle of forty-five degrees.

108
00:08:11,677 --> 00:08:15,625
The status changes to CHECK so the problem cannot be missed.

109
00:08:16,325 --> 00:08:20,590
Let us go back to sixty degrees, the most common bridle angle.

110
00:08:20,590 --> 00:08:22,447
The status returns to PASS.

111
00:08:23,147 --> 00:08:29,034
Under the inputs, choose what connects each sling to the load, a shackle or a hook, for the left

112
00:08:29,034 --> 00:08:30,383
and right load points.

113
00:08:30,383 --> 00:08:34,369
The connection at the crane hook is worked out by the calculator.

114
00:08:35,069 --> 00:08:41,396
The lifting equipment summary lists every item of rigging the calculator has selected: the two slings

115
00:08:41,396 --> 00:08:46,909
with their diameter, capacity and length, the shackles, and the master link at the hook.

116
00:08:47,609 --> 00:08:52,824
For each item you see the working load limit, the length, the weight and the quantity,

117
00:08:52,824 --> 00:08:55,492
with the total rigging weight at the bottom.

118
00:08:55,492 --> 00:08:58,766
This is ready to copy into a gear list or a lift plan.

119
00:08:59,466 --> 00:09:03,111
Calculation results and checks shows the full working.

120
00:09:03,111 --> 00:09:06,553
The design load includes a ten percent contingency.

121
00:09:06,553 --> 00:09:10,873
Then come the support reactions, the sling angles, the tensions,

122
00:09:10,873 --> 00:09:15,530
and the required working load limit after the sling selection factor.

123
00:09:16,230 --> 00:09:20,145
For wire rope, the bend efficiency of the sling eye is checked,

124
00:09:20,145 --> 00:09:25,985
and the effective working load limit after de-rating is compared with the tension in each leg.

125
00:09:25,985 --> 00:09:29,030
The master link and its shackles are checked too.

126
00:09:29,730 --> 00:09:34,201
The overall status at the bottom is PASS only when every check is met.

127
00:09:34,201 --> 00:09:40,205
If any check fails, the row that failed is highlighted, so you can see exactly what to change.

128
00:09:40,905 --> 00:09:45,901
Finally, the optional check tests whether each shackle physically fits its padeye.

129
00:09:45,901 --> 00:09:48,521
It does not affect the sling results above.

130
00:09:49,221 --> 00:09:55,544
Select Yes, choose the shackle manufacturer, and enter the padeye plate thickness and hole diameter.

131
00:09:55,544 --> 00:09:59,591
The jaw width and pin diameter come from the manufacturer range,

132
00:09:59,591 --> 00:10:03,258
or you can enter the values from your shackle certificate.

133
00:10:03,958 --> 00:10:08,210
A fit is green when the jaw is about ten percent wider than the plate

134
00:10:08,210 --> 00:10:11,415
and the pin about ten percent smaller than the hole.

135
00:10:11,415 --> 00:10:14,004
Amber means it fits with little clearance.

136
00:10:14,004 --> 00:10:16,161
Red means the shackle will not fit.

137
00:10:16,861 --> 00:10:24,025
At the top right, Save stores this calculation in your account, and Report, or PDF, opens an A4 report.

138
00:10:24,025 --> 00:10:27,016
We will look at both later in the tutorial.

139
00:10:27,016 --> 00:10:30,215
Reset clears your inputs back to the defaults.

140
00:10:30,915 --> 00:10:33,797
Every other arrangement works the same way.

141
00:10:33,797 --> 00:10:35,674
Here is the four-leg bridle.

142
00:10:35,674 --> 00:10:40,030
Notice the note: the gear is sized on two legs carrying the load,

143
00:10:40,030 --> 00:10:44,185
because on a rigid load all four legs rarely share it equally.

144
00:10:44,885 --> 00:10:49,945
Each arrangement has its own sketch with the sling names, the angles and the distances,

145
00:10:49,945 --> 00:10:52,970
so you can match the inputs to your rigging drawing.

146
00:10:53,670 --> 00:10:58,101
For pipes and other round loads, use the two-leg choker hitch, option A.

147
00:10:58,101 --> 00:11:04,747
The slings are wrapped around the pipe, so there are two extra inputs: the pipe diameter, and the wrap type,

148
00:11:04,747 --> 00:11:08,009
which can be no wrap, a single wrap or a double wrap.

149
00:11:08,009 --> 00:11:11,825
The sling length is worked out from the diameter and the wrap.

150
00:11:12,525 --> 00:11:16,031
In the results, the hitch mode factor is now 0.75.

151
00:11:16,031 --> 00:11:21,150
A choked sling can carry only three quarters of its straight-pull rating,

152
00:11:21,150 --> 00:11:27,181
so the required working load limit is higher than for a bridle carrying the same load.

153
00:11:27,881 --> 00:11:32,515
The tailing lift is used to upend a vessel or a column with two cranes.

154
00:11:32,515 --> 00:11:37,737
The main crane lifts at the upper lugs, and the tail crane holds the bottom lug.

155
00:11:38,437 --> 00:11:43,669
Enter the distances from the centre of gravity to the upper lugs and to the tailing lug,

156
00:11:43,669 --> 00:11:50,329
any offsets from the centre line, the load weight, the spacing between the upper lugs, the tailing sling length,

157
00:11:50,329 --> 00:11:53,242
both hook block weights and the main sling angle.

158
00:11:53,942 --> 00:12:00,661
The load transfer table shows how the load passes from the tail crane to the main crane at every angle,

159
00:12:00,661 --> 00:12:06,337
from horizontal to vertical, so both cranes can be checked at every stage of the upend.

160
00:12:07,037 --> 00:12:13,962
The main crane can be rigged with two slings direct to the hook, which is option one, or through a spreader beam

161
00:12:13,962 --> 00:12:17,178
with two vertical lower slings, which is option two.

162
00:12:17,178 --> 00:12:20,455
Choose the option and the gear list updates to match.

163
00:12:21,155 --> 00:12:21,965
Chapter four.

164
00:12:21,965 --> 00:12:24,270
The side boom pipelayer lift planner.

165
00:12:24,970 --> 00:12:31,240
This planner prepares a lift plan for lowering or lifting a pipe string with one or more side booms.

166
00:12:31,240 --> 00:12:38,325
It works out the pipe weight, the work radius from the trench, the load per machine, the capacity at that radius,

167
00:12:38,325 --> 00:12:40,394
and the spacing between machines.

168
00:12:41,094 --> 00:12:42,703
The screen has two parts.

169
00:12:42,703 --> 00:12:48,239
On the left, fill in step by step guides you through the inputs one section at a time.

170
00:12:48,239 --> 00:12:52,166
On the right is the full lift plan, exactly as it will print.

171
00:12:52,866 --> 00:12:58,307
You can fit the plan to the width of the screen, or view it at one hundred percent and scroll.

172
00:12:58,307 --> 00:13:02,765
Anything you type on the left appears in the plan on the right straight away.

173
00:13:03,465 --> 00:13:05,314
Step one is the plan header.

174
00:13:05,314 --> 00:13:10,995
Enter the date, a reference, the location, the side boom ID and a lifting description.

175
00:13:11,695 --> 00:13:18,066
Then record the operator and licence, the third party inspection reference, the pre-use inspection checklist

176
00:13:18,066 --> 00:13:21,487
and the certificate reference for the lifting accessories.

177
00:13:22,187 --> 00:13:23,794
Next choose the machine.

178
00:13:23,794 --> 00:13:28,616
Pick the make, such as Caterpillar, Komatsu or Liebherr, then the model.

179
00:13:28,616 --> 00:13:34,241
The planner holds rated load charts for sixty-seven side boom and boom combinations.

180
00:13:34,941 --> 00:13:41,206
For the boom, leave it on automatic and the planner picks the shortest boom that reaches the work radius,

181
00:13:41,206 --> 00:13:43,175
or choose a boom length yourself.

182
00:13:43,875 --> 00:13:46,298
Step two is the trench and work radius.

183
00:13:46,298 --> 00:13:51,577
Enter the trench top width and depth, and choose whether the trench sides are stable.

184
00:13:52,277 --> 00:13:57,479
The work radius is measured from the outside edge of the track to the trench centreline.

185
00:13:57,479 --> 00:14:03,273
The planner adds a set-back from the trench edge, which depends on the trench depth and condition,

186
00:14:03,273 --> 00:14:06,229
and gives you the radius the machine must work at.

187
00:14:06,929 --> 00:14:08,420
Step three is the pipe.

188
00:14:08,420 --> 00:14:15,034
You can pick the nominal size and schedule from the built-in pipe table, or enter the outside diameter

189
00:14:15,034 --> 00:14:16,785
and wall thickness by hand.

190
00:14:17,485 --> 00:14:23,327
Enter the length of the pipe string, the steel density, and any allowance for coating or contents.

191
00:14:23,327 --> 00:14:27,917
The planner calculates the weight per metre and the total pipe string weight.

192
00:14:28,617 --> 00:14:31,228
Then say how the machines share the string.

193
00:14:31,228 --> 00:14:36,998
With one machine type, enter how many side booms share it and the rigging weight per side boom.

194
00:14:36,998 --> 00:14:40,521
The load on the governing side boom is worked out for you.

195
00:14:41,221 --> 00:14:44,126
Step four is the capacity at the work radius.

196
00:14:44,126 --> 00:14:50,453
The planner reads the chart capacity of the chosen machine at that radius, applies the duty limit,

197
00:14:50,453 --> 00:14:53,423
and compares it with the load on each machine.

198
00:14:54,123 --> 00:14:59,760
By default the duty limit is eighty-five percent, in line with ASME B30.14.

199
00:14:59,760 --> 00:15:05,396
You can see the capacity utilisation and the safety margin, and a clear yes

200
00:15:05,396 --> 00:15:08,929
or no for whether the lift is within the limit.

201
00:15:09,629 --> 00:15:16,494
Further down the plan, the chart plots the rated capacity, the duty limit and this lift against the work radius,

202
00:15:16,494 --> 00:15:18,823
so you can see how much room there is.

203
00:15:19,523 --> 00:15:26,619
Step five checks the number of side booms and their spacing, following BS 7121 part 14, annex H.

204
00:15:26,619 --> 00:15:33,937
Choose the basis for the safe working load, and the planner gives the number of side booms required

205
00:15:33,937 --> 00:15:36,377
and the spacing along the string.

206
00:15:37,077 --> 00:15:39,211
Step six is the basic questions.

207
00:15:39,211 --> 00:15:46,615
Answer yes, no or not applicable for each one: has the pipe weight been calculated, are the people experienced,

208
00:15:46,615 --> 00:15:53,951
is there a risk assessment, have the machines and accessories been inspected, is the ground stable, and so on.

209
00:15:54,651 --> 00:15:56,358
The last step is approvals.

210
00:15:56,358 --> 00:16:02,995
There are three people on every plan: the person who planned it, the person who reviewed and approved it,

211
00:16:02,995 --> 00:16:04,955
and the person who executed it.

212
00:16:04,955 --> 00:16:10,075
Enter each name and job title, and the signature and date go on the printed plan.

213
00:16:10,775 --> 00:16:13,622
The tabs above the plan hold more information.

214
00:16:13,622 --> 00:16:20,802
Machines on the string lets you enter different machines along the same string when they are not all the same model.

215
00:16:21,502 --> 00:16:28,670
How to use explains the method in plain words, and Basis and sources lists the standards and data the planner uses.

216
00:16:29,370 --> 00:16:35,586
Plan details records the lift category, the ground conditions and the risk assessment for this plan.

217
00:16:35,586 --> 00:16:39,439
We will see these shared plan details in the forklift chapter.

218
00:16:40,139 --> 00:16:40,941
Chapter five.

219
00:16:40,941 --> 00:16:42,913
The forklift truck lift planner.

220
00:16:43,613 --> 00:16:49,814
This planner checks that a forklift can lift a load safely at its real load centre and lift height.

221
00:16:49,814 --> 00:16:56,391
It covers single loads, several loads on the forks at once, and tubulars such as pipe and casing bundles.

222
00:16:57,091 --> 00:17:03,491
Step one is the plan header: the lift plan number, location, reference and a description of the lift.

223
00:17:04,191 --> 00:17:09,208
Enter the operator certificate number, the slinger certificate number if one is used,

224
00:17:09,208 --> 00:17:12,277
and the identification number of the forklift truck.

225
00:17:12,977 --> 00:17:17,046
Step two is the most important choice: what are you lifting?

226
00:17:17,046 --> 00:17:20,776
Plan A is a single load, or several loads on the forks.

227
00:17:20,776 --> 00:17:25,862
Plan B is tubulars, either all the same diameter or of different diameters.

228
00:17:26,562 --> 00:17:29,711
This choice decides which part of the plan you fill in.

229
00:17:29,711 --> 00:17:34,178
The planner tells you clearly which block is in use, and greys out the others.

230
00:17:34,878 --> 00:17:37,470
For a single load, enter the load weight.

231
00:17:37,470 --> 00:17:40,126
Here, two thousand five hundred kilograms.

232
00:17:40,826 --> 00:17:44,587
Then the distance of the centre of gravity from the fork face.

233
00:17:44,587 --> 00:17:48,469
This is the load centre, and it matters more than anything else.

234
00:17:48,469 --> 00:17:52,047
All distances on this plan are measured from the fork face.

235
00:17:52,747 --> 00:17:59,880
You can also record the load length, width and height and the sideways and vertical offsets of the centre of gravity.

236
00:17:59,880 --> 00:18:05,611
These are recorded on the plan, while the weight and the load centre drive the capacity check.

237
00:18:06,311 --> 00:18:08,581
Step three is the lift configuration.

238
00:18:08,581 --> 00:18:14,837
Enter the lift height, which here is three thousand five hundred millimetres, and any fork extensions,

239
00:18:14,837 --> 00:18:16,615
with their length and weight.

240
00:18:17,315 --> 00:18:19,270
Then choose the forklift truck.

241
00:18:19,270 --> 00:18:23,936
The planner holds nine hundred and fifteen trucks from thirty-four makers.

242
00:18:23,936 --> 00:18:27,278
Pick the manufacturer, the model and the mast fitted.

243
00:18:27,978 --> 00:18:31,768
The plan now shows the truck type and its plate capacity,

244
00:18:31,768 --> 00:18:36,887
for example four thousand kilograms at a five hundred millimetre load centre.

245
00:18:36,887 --> 00:18:41,674
The capacity is then derated for the actual load centre and lift height.

246
00:18:42,374 --> 00:18:48,365
The ninety percent duty check compares the load with ninety percent of the derated capacity.

247
00:18:48,365 --> 00:18:55,985
If the load is too heavy, or the load centre too far out, the result turns red and the cautions section explains why.

248
00:18:56,685 --> 00:19:03,104
The capacity chart shows the rated capacity and the ninety percent duty limit against the load centre,

249
00:19:03,104 --> 00:19:06,754
with this lift marked on it, so the margin is easy to see.

250
00:19:07,454 --> 00:19:12,640
Step four is the basic questions, such as whether there is a documented lifting method,

251
00:19:12,640 --> 00:19:17,886
whether the weight of the load is known, and whether the area is free from obstructions.

252
00:19:18,586 --> 00:19:26,452
And step five is approvals, with the same three people as the side boom plan: planned by, reviewed and approved by,

253
00:19:26,452 --> 00:19:27,546
and executed by.

254
00:19:28,246 --> 00:19:30,095
The tabs give more options.

255
00:19:30,095 --> 00:19:37,699
Site lists is a simple sheet where you can keep your own lists of locations, operator and slinger certificates,

256
00:19:37,699 --> 00:19:42,219
names, job titles and truck numbers, ready to copy into each plan.

257
00:19:42,919 --> 00:19:47,542
Several loads on the forks is used when you carry more than one item at once.

258
00:19:47,542 --> 00:19:54,327
Enter the weight and length of each section, starting with the one nearest the fork face, and the combined weight

259
00:19:54,327 --> 00:19:58,770
and combined centre of gravity are worked out by the weight-moment method.

260
00:19:59,470 --> 00:20:03,015
Tubulars handles bundles of tubing, casing or pipe.

261
00:20:03,015 --> 00:20:10,245
Pick the size and weight per foot from the built-in datasheet, which includes API 5CT tubing and casing,

262
00:20:10,245 --> 00:20:11,774
or enter them by hand.

263
00:20:11,774 --> 00:20:18,030
With the number of joints, the planner works out the total load and its centre of gravity.

264
00:20:18,730 --> 00:20:21,451
Plan details is shared by both planners.

265
00:20:21,451 --> 00:20:27,370
Choose the lift category, routine, simple, complex or critical, and record the reasons.

266
00:20:28,070 --> 00:20:34,996
Record the ground conditions, such as firm and level, soft ground, near an excavation or over services.

267
00:20:34,996 --> 00:20:42,326
Then build the risk assessment: add hazards, their controls, a likelihood times severity rating and an owner.

268
00:20:42,326 --> 00:20:45,755
Common lifting hazards can be added with one click.

269
00:20:46,455 --> 00:20:47,258
Chapter six.

270
00:20:47,258 --> 00:20:49,933
The wooden mat, or cribbage, calculator.

271
00:20:50,633 --> 00:20:56,232
This calculator works out the load under a mobile crane outrigger, the ground bearing pressure,

272
00:20:56,232 --> 00:20:59,827
and the size of timber mat needed to spread that load safely.

273
00:21:00,527 --> 00:21:04,044
After the optional job details, step two is the crane.

274
00:21:04,044 --> 00:21:11,599
Choose the manufacturer and the model from the crane database, which holds two hundred and nine mobile crane models.

275
00:21:12,299 --> 00:21:18,790
The crane type, its maximum rated capacity and its operating weight are filled in from the database.

276
00:21:18,790 --> 00:21:25,995
If you have extra counterweight or attachments, or you know the actual operating weight, you can enter it here.

277
00:21:26,695 --> 00:21:28,079
Step three is the load.

278
00:21:28,079 --> 00:21:31,868
Enter the weight of the load and of the rigging and hook block.

279
00:21:31,868 --> 00:21:34,695
Here the load is twenty-two thousand kilograms.

280
00:21:35,395 --> 00:21:37,067
Step four is the ground.

281
00:21:37,067 --> 00:21:38,530
Choose the soil type.

282
00:21:38,530 --> 00:21:42,780
The calculator uses presumptive bearing values for each soil,

283
00:21:42,780 --> 00:21:47,726
and the soil field guide tab explains how to identify the soil on site.

284
00:21:48,426 --> 00:21:53,986
If the ground is wet or waterlogged, select yes and the allowable pressure is reduced.

285
00:21:53,986 --> 00:22:01,162
If you have a value verified on site, for example from a plate load test, enter it and it will be used instead.

286
00:22:01,862 --> 00:22:04,401
Step five is the outrigger load basis.

287
00:22:04,401 --> 00:22:11,818
By default the calculator uses a rule of thumb, sixty-five percent of the crane plus the load on one outrigger.

288
00:22:11,818 --> 00:22:18,566
If you have the actual outrigger load from the manufacturer software, enter it and it takes priority.

289
00:22:19,266 --> 00:22:26,030
The results are on the right, per outrigger: the governing outrigger load, the allowable ground bearing pressure,

290
00:22:26,030 --> 00:22:29,143
the bearing area needed, and the minimum square mat.

291
00:22:29,843 --> 00:22:36,777
The green banner gives the recommended mat size per outrigger, in metres, and the minimum in feet is shown too.

292
00:22:37,477 --> 00:22:40,685
Step six is an optional check of your proposed mat.

293
00:22:40,685 --> 00:22:46,598
Enter the outrigger float size, the mat length, width and thickness, and the allowable bending

294
00:22:46,598 --> 00:22:48,549
and shear stress of the timber.

295
00:22:49,249 --> 00:22:55,014
The calculator then checks the pressure under the float, the pressure under the mat, and the bending

296
00:22:55,014 --> 00:22:56,398
and shear in the timber.

297
00:22:56,398 --> 00:23:00,491
Warnings and checks at the bottom tell you if anything needs attention.

298
00:23:01,191 --> 00:23:06,232
The method and guidelines tab explains the calculation with a worked example.

299
00:23:06,232 --> 00:23:11,208
The mat area is the outrigger load divided by the allowable ground pressure,

300
00:23:11,208 --> 00:23:18,082
and the default outrigger load follows the rule of thumb in the Queensland mobile crane code of practice.

301
00:23:18,082 --> 00:23:21,159
The assumptions and limitations are listed too.

302
00:23:21,859 --> 00:23:22,788
Chapter seven.

303
00:23:22,788 --> 00:23:25,507
The lashing and load securing calculator.

304
00:23:26,207 --> 00:23:33,969
This calculator works out the number and type of lashings needed to secure a load for road transport,

305
00:23:33,969 --> 00:23:40,501
following BS EN 12195-1 and the tie-down count rules of the load securing guidelines.

306
00:23:41,201 --> 00:23:47,968
It is organised in six tabs: the trailer and equipment, the load, the calculation, lashing diagrams,

307
00:23:47,968 --> 00:23:51,014
a compliance report and a pre-trip checklist.

308
00:23:51,714 --> 00:23:53,173
Tab one is the trailer.

309
00:23:53,173 --> 00:23:56,154
Choose the vehicle type, for example a flatbed.

310
00:23:56,154 --> 00:24:01,165
Typical dimensions appear on the right and the matching picture is highlighted.

311
00:24:01,865 --> 00:24:06,737
Choose the bed surface, because it sets the friction between the deck and the cargo.

312
00:24:06,737 --> 00:24:13,001
Say whether a headboard is fitted, and enter the number of anchor points and their rated working load limit.

313
00:24:13,701 --> 00:24:19,688
The second step lists the lashing and restraint equipment you have available: ratchet straps,

314
00:24:19,688 --> 00:24:25,353
chains of different grades, wire rope, anti-slip mats, chocks, edge protectors and more.

315
00:24:25,353 --> 00:24:28,314
Mark what you have, the quantity and the size.

316
00:24:29,014 --> 00:24:30,329
Tab two is the load.

317
00:24:30,329 --> 00:24:36,706
Choose the cargo category, such as pipes and tubulars, pallets, coils and drums, or steel sheets,

318
00:24:36,706 --> 00:24:40,257
and enter the weight per unit and the number of units.

319
00:24:40,957 --> 00:24:46,363
Choose the contact surface under the cargo, and whether an anti-slip mat is used.

320
00:24:46,363 --> 00:24:49,834
Then enter the dimensions and the centre of gravity.

321
00:24:49,834 --> 00:24:54,439
The required dimensions change automatically with the cargo category.

322
00:24:55,139 --> 00:25:02,371
The last section lets you override the lashing arrangement if you need to: the primary equipment, the lashing method,

323
00:25:02,371 --> 00:25:05,709
frictional, direct or locking, and the lashing angles.

324
00:25:05,709 --> 00:25:08,985
Leave these blank and the calculator chooses for you.

325
00:25:09,685 --> 00:25:12,234
Tab three is the calculation engine.

326
00:25:12,234 --> 00:25:13,367
It is read only.

327
00:25:13,367 --> 00:25:19,244
It takes the larger of the guideline tie-down rules and the EN 12195-1 force check,

328
00:25:19,244 --> 00:25:22,289
and gives the governing number of lashings.

329
00:25:22,289 --> 00:25:28,095
Until every required input is present, it tells you exactly what is still missing.

330
00:25:28,795 --> 00:25:35,537
Tab four shows lashing diagrams for each type of cargo, so the driver can see how the load should be secured.

331
00:25:36,237 --> 00:25:38,620
Tab five is the compliance report.

332
00:25:38,620 --> 00:25:44,017
Fill in the job details, such as the vehicle, the driver and the destination.

333
00:25:44,017 --> 00:25:51,447
The trailer, equipment, load and results are filled in automatically, and the report prints one page wide.

334
00:25:52,147 --> 00:25:58,563
And tab six is the pre-trip inspection checklist, covering general load securing, the trailer structure

335
00:25:58,563 --> 00:26:03,857
and anchor points, the lashing equipment, and specific checks for each type of cargo.

336
00:26:03,857 --> 00:26:07,657
Print it and go through it with the driver before every trip.

337
00:26:08,357 --> 00:26:09,170
Chapter eight.

338
00:26:09,170 --> 00:26:12,773
Saving your work, printing reports, and the approval workflow.

339
00:26:13,473 --> 00:26:16,013
In any planner or calculator, click Save.

340
00:26:16,013 --> 00:26:20,598
Give the plan a name and it is stored in your account with all its inputs.

341
00:26:21,298 --> 00:26:26,610
Every time you save, a new version is kept, up to twenty earlier versions per plan,

342
00:26:26,610 --> 00:26:29,746
so you can always go back to an earlier revision.

343
00:26:30,446 --> 00:26:33,309
Click Report or PDF to open the A4 report.

344
00:26:33,309 --> 00:26:38,489
It shows the plan name, who prepared it, when it was saved, and the version.

345
00:26:39,189 --> 00:26:46,387
Below is the full calculation sheet, exactly as on screen, with every input and check, followed by the charts,

346
00:26:46,387 --> 00:26:49,855
the cautions, the conditions and the approval blocks.

347
00:26:50,555 --> 00:26:52,605
Click Print or save as PDF.

348
00:26:52,605 --> 00:26:55,338
The report is laid out for A4 paper.

349
00:26:55,338 --> 00:27:02,929
Use your browser print dialog to print it, or choose save as PDF to keep a copy or send it by email.

350
00:27:03,629 --> 00:27:06,568
All saved plans are in the plan library.

351
00:27:06,568 --> 00:27:13,549
Search by name, site or reference, or filter by status: draft, submitted, approved or returned.

352
00:27:14,249 --> 00:27:21,203
From the library you can open a plan to edit it, print its report, duplicate it for a similar lift, or delete it.

353
00:27:21,903 --> 00:27:24,901
To have a plan approved, click Send for approval.

354
00:27:24,901 --> 00:27:31,631
Enter the approver email address, their name and role as it should appear on the report, and a note if needed.

355
00:27:32,331 --> 00:27:34,846
The plan is saved and locked for review.

356
00:27:34,846 --> 00:27:41,194
When the approver signs in with that email address, they find it under Approvals, and can approve it,

357
00:27:41,194 --> 00:27:42,891
or return it with comments.

358
00:27:43,591 --> 00:27:49,083
If anyone edits the plan after it is approved, the approval is withdrawn automatically,

359
00:27:49,083 --> 00:27:52,807
so a printed approved plan always matches what was checked.

360
00:27:53,507 --> 00:28:00,975
Calculations from the sling, mat and lashing calculators are kept in the calculation history, with the date, tool

361
00:28:00,975 --> 00:28:05,667
and status, ready to reopen, change one value and print a new revision.

362
00:28:06,367 --> 00:28:07,138
Chapter nine.

363
00:28:07,138 --> 00:28:09,866
Finding and booking a lifting training course.

364
00:28:10,566 --> 00:28:12,739
Open Training from the top menu.

365
00:28:12,739 --> 00:28:19,870
The academy lists every course, for riggers, banksmen and signallers, lifting supervisors, lift planners,

366
00:28:19,870 --> 00:28:22,790
appointed persons and equipment inspectors.

367
00:28:23,490 --> 00:28:26,261
Use the category buttons to filter the list.

368
00:28:26,261 --> 00:28:33,188
Each card shows the level, how the course is delivered, the duration, the certificate validity, the group size

369
00:28:33,188 --> 00:28:33,943
and the fee.

370
00:28:34,643 --> 00:28:41,591
Open a course to see the full details: what it covers, the learning objectives, who should attend, the topics,

371
00:28:41,591 --> 00:28:45,822
the prerequisites, and how participants are assessed and certified.

372
00:28:46,522 --> 00:28:52,548
The summary on the right repeats the fee, the duration, the level, the delivery, the group size,

373
00:28:52,548 --> 00:28:57,381
how long the certificate is valid, and the refresher needed to keep it valid.

374
00:28:58,081 --> 00:29:05,445
To book, fill in the registration form at the bottom of the page: your name, email, phone, company and country,

375
00:29:05,445 --> 00:29:10,753
the number of participants, onsite or online delivery, and your preferred dates.

376
00:29:11,453 --> 00:29:13,049
Click Send registration.

377
00:29:13,049 --> 00:29:14,646
No payment is taken now.

378
00:29:14,646 --> 00:29:19,303
We confirm the dates by email, and send the invoice before the course.

379
00:29:20,003 --> 00:29:23,810
To train a whole team at your own site, use corporate training.

380
00:29:23,810 --> 00:29:30,094
Any course can be run in-house, with the dates, the content emphasis and the group size agreed with you.

381
00:29:30,794 --> 00:29:36,837
The certification page explains how each course is assessed, how long each certificate is valid,

382
00:29:36,837 --> 00:29:39,166
and how to renew it with a refresher.

383
00:29:39,166 --> 00:29:43,573
Your own bookings appear under My course bookings inside the platform.

384
00:29:44,273 --> 00:29:45,088
Chapter ten.

385
00:29:45,088 --> 00:29:49,094
Using LiftPlan Pro on a phone, and the offline Android app.

386
00:29:49,794 --> 00:29:52,784
Everything you have seen works in a phone browser.

387
00:29:52,784 --> 00:29:58,583
The guided input panels are sized for a small screen, so a plan can be checked at the work front.

388
00:29:59,283 --> 00:30:06,362
There is also an online Android app, which works exactly like the website, and an offline app, LiftPlan Field,

389
00:30:06,362 --> 00:30:10,995
which runs every planner and calculator on the phone without any signal.

390
00:30:11,695 --> 00:30:15,038
The offline app is activated with your app licence key,

391
00:30:15,038 --> 00:30:19,535
which you will find on your account page once your subscription is active.

392
00:30:19,535 --> 00:30:22,938
The key stays valid for the length of your subscription.

393
00:30:23,638 --> 00:30:25,174
That completes the tour.

394
00:30:25,174 --> 00:30:26,006
Let us recap.

395
00:30:26,006 --> 00:30:33,110
Choose the tool for your lift, enter the load and the equipment, read the checks as they update, save the plan,

396
00:30:33,110 --> 00:30:35,734
send it for approval, and print it on A4.

397
00:30:36,434 --> 00:30:39,302
Remember that the results are planning aids.

398
00:30:39,302 --> 00:30:44,778
Always confirm certified working load limits, manufacturer data and site conditions,

399
00:30:44,778 --> 00:30:49,277
and have the lift plan approved by a competent person before lifting.

400
00:30:49,977 --> 00:30:52,642
Two sling calculators are free to try.

401
00:30:52,642 --> 00:30:57,482
Every planner and calculator is included for 24.99 US dollars a year,

402
00:30:57,482 --> 00:31:01,550
and our lifting training courses can be booked separately.

403
00:31:01,550 --> 00:31:04,355
Thank you for watching, and lift safely.